Skip to content

004 · Manufacturing · 2024

Stockroom

Retired 11 spreadsheets into one production board.

FLOOR SCANSBATCH INTAKEPRODUCTION BOARDSHIFT VIEWPLANNING
How the systems connect
Stack
ReactSQLiteOffline-first sync

[The bottleneck]

Production tracking lived in eleven spreadsheets maintained by four people, each with a slightly different idea of what a batch was. Nobody could answer what was actually on the floor.

[What I built]

A production board with one definition of a batch, built around how the floor already worked rather than an idealised process. Barcode input, offline tolerance, and a printable end-of-shift view.

[The result]

One source of truth for what is in production. Shift handover went from a twenty minute conversation to a glance at a screen.

Tell me what is slow.

A 30-minute call, no charge. You will leave with a clearer picture of the problem whether or not we work together.

Booking projects for Q4 2026